Sunday, November 13, 2016

From “Sprawl” to a “Complete Community”

I keep the “Sprawl Repair Manual” by Galina Tachieva on my desk at home. The work “presents a comprehensive methodology for transforming sprawl” along with “implementation techniques” for “rebalancing suburbia.”

Why? Well, I hate to point out that much of Pelham developed as sprawl.

During the late-1800s and early-1900s, development in the former Township of Pelham and Village of Fonthill grew along traditional coach routes (like Canboro Road) and at crossings along the TH&B (through Fenwick) and NS&T (through Fonthill) railway lines.

But, the advent of the automobile quickly changed all that.

For example, only in a car-centered-culture would one build a high school on some of the best tender fruit land and on a (then) Provincial Highway.

Similarly, prior to the hundreds of homes around it, the Pelham Arena was erected in the mid-1970s in a farmer’s field and far from restaurants and retail.

In fact, much of Pelham’s previous residential development sprawled across farm lands and forests. These now-mature residential neighbourhoods from the 1970s and 80s contain more than 50 cul-de-sacs or courts! That’s quite different than traditional neighbourhoods of College, Emmett, Elm, Burton and Chestnut streets.

Previous Councils also expanded the Town’s “urban boundaries” – the areas in which one can develop. The +500 acres in East Fonthill and “Lookout Ridge” were added in 2000. Significant developable lands in Fenwick – from Cream to Balfour and between Memorial and Welland Road – were added in 1990.

Once approved, these urban-land-rights last forever, guaranteeing a development future for Pelham.

Given this history, how does one “repair” the sprawl and foster a more “complete” community?

We started by revitalizing Downtown Fonthill and Fenwick; in addition to rebuilding the streetscapes, one-third of the buildings on Pelham Street have recently improved their façades and added residential units.

We’ve also encouraged walking and cycling by building more than 13 km of sidewalks, 9 km of bike lanes, 7 km of trails, and 5 crosswalks. Now – 53 years after it opened – we’ve approved extending a sidewalk to Crossley. We’ve also discouraged car use by initiating Pelham transit.

We approved plans for East Fonthill that include wide-sidewalks and trails and a road network that links to existing streets; to enable these plans, we’ve even removed houses were future streets will go.

We’ve insisted on street-facing commercial development and on as pedestrian-friendly-as-possible parking. We continue to call for rear-lanes and we protected key environmental features.

Instead of consolidating services into a central building, we’re revitalizing the Maple Acre Library. And, we’re constructing the new Pelham Community Centre near other amenities – like stores and restaurants, and a future medical centre, retirement home, and other “mixed-uses.”

Finally, we remain committed to the Town’s urban boundaries and increased the protections on the Fonthill Kame.

Correcting Pelham’s sprawl isn’t easy, but Council and I will persevere toward that goal.

Monday, July 7, 2014

Construction “Season” Beginning in Pelham

I thought I better remind you of some road reconstruction projects in Pelham since we appear to be at the start of construction “season.”

“Uptown Fonthill” Reconstruction:
The Region is taking the lead on the reconstruction of Regional Road 20 from Peachtree Park to Lookout Street, and the reconstruction of Haist Street from Canboro Road to  Highway 20 (one of the worst road sections in Pelham).
The works will include adding bike lanes, adding new sidewalks, upgrading the watermain, road reconstruction (including a turning lane to Haist Street North), and a new traffic signal.
We are also replacing the water main from just west of Pelham and up–the-hill (as part of our ongoing fight to rid the Town of cast-iron water pipes). The contractor will also resurface Regional Road 20 from Pelham Street to Peachtree to fix those persistent ripple-bumps.
Regional staff has assured me that Pelham Street will be open to allow for traffic flow during Summerfest.

Downtown Fenwick Revitalization:
At long last, we will be revitalizing Downtown Fenwick this year!
This project includes reconstructing Canboro Road and part of Maple Street (fixing yet another poor road section), part of Church Street, and the Welland Road intersection.
Just like improvements in Pelham’s other Downtowns, we will bury the hydro lines.
In addition, we will replace the storm sewers and tie them correctly into systems on adjoining streets; with a high water table, this deep storm–sewer work will require the contractor to partially “dewater” the area.
All the significant landscaping improvements will not only make Downtown Fenwick more quaint and walkable, it will also honour the historic (and recently refurbished) flagpole.
Based on the pre-construction meeting on June 26, the contractor will start dewatering by mid-July.

Port Robinson Road – Phase Two:
As you know, the Town recently reconstructed Port Robinson Road from Pelham Street to Station Street and added bike lanes and sidewalks. Now, we are continuing to enhance walkability and cycle-ability by reconstructing Port Robinson – from Station Street to Rice Road.
In addition to bike lanes, sidewalks on both sides, and a reconstructed road, we will also be supporting further development on both the North and South sides of Port Robinson by installing sewers. Folks currently on Port Robinson will be able to connect to the sewers (if they so choose to stop using their private septic systems).
The works will also add storm-sewers and help deal with chronic ditch and water issues in the area.

As construction “season” begins in Pelham, I appreciate your patience and understanding. I also look forward to the completion of these and many other improvements in 2014!

Monday, August 26, 2013

Making Pelham More Walkable & Cyclable This Fall

Some imminent construction will not only improve roads but will also make the Town even more walkable and cyclable.

Port Robinson Road:
The Town will reconstruct Port Robinson Road from Pelham Street to Station Street including repairing some sewer sections, and replacing water lines and storm-sewers this fall. The rebuilt road will include bike lanes and parallel parking along the School. Finally, we will reconstruct and add sidewalks on both sides of the road and re-align the Steve Bauer Trail entrance to match Station Street. (While the Town awarded the contract in June to try to complete this work prior to the restart of school, an MOE approval, the surprise location of a gas-line, and the contractor’s schedule added to the project’s timeline.)

Pelham Street:
You will recall that while Council earmarked $2.5 million for reconstructing Pelham Street from College Street to Quaker Road, the estimate came back at $6.5 million. We did apply for special Provincial funding in January (thanks to the Glynn A. Green School community, the PBA, the Chamber, and all others who wrote letters of support!), but learned we were unsuccessful in the spring. Perhaps we can apply under a new, $100 million Provincial program this fall.

In the meantime, the Town will construct a new sidewalk on the west-side of Pelham Street from Pancake Lane to Brock / Port Robinson Road this fall. 

What about the idea of a traffic signal at Pancake? Installing a complete traffic signal did not meet the Ministry of Transportation’s “warrants” but did meet some opposition from local residents. Following the successful use of the Creative Problem Solving Process, Council recently approved the installation of pedestrian-priority traffic signals (like that on Haist Street at A.K. Wigg School) at Pancake Lane / John Street and at Spruceside Crescent / Bacon Lane this fall. We will also paint reduced lane widths as an attempt to lower vehicle speeds and to provide more room for cyclists.

Regional Road #20:
The Region will be constructing a special storm-sewer outlet from Regional Road 20 through Marlene Stewart-Streit Park this fall. Town Council recently approved reallocating some savings from this project so that we can add sidewalks along both sides of “Old Hwy 20” from Park Lane to Pinecrest and from Canboro Road to Church Hill. The Region will also resurface the road in that area.

And, did you notice the new school-zone lights on Regional Road #20 around St. Alexander School? Please watch for their activation next week during student’s morning and afternoon walks to school.

Pelham Town Square and Church Hill:
The Town will also reconstruct the sidewalk on the south-side of Pelham Town Square from Station Street to the Post Office and install a pedestrian-priority traffic signal at Church Hill across Pelham Street this fall.

Please be assured that Council and I continue to strive in making Pelham even more walkable and cyclable.