Monday, October 11, 2010

Greatest Achievement & Biggest Disappointment

Below are my notes for the third prepared question at the Mayoral debate, hosted by the Fonthill Rotary Club on Wednesday, October 6, 2010 at the Royal Canadian Legion.

Question 3)
In your term on Council, what do you consider to be:
a) your greatest achievement
b) your biggest disappointment or failure?



GREATEST ACHIEVEMENT:
Working together with Council, Staff, the Community, Federal and Provincial reps, and Ministerial staff to Make Investments Happen for Pelham.

Over the decades, Pelham used to be "shut out" from grants while other cities and towns received millions of dollars.

Now, Pelham has become a leader! These $8.4 investments represent the second highest per person stimulus funding in Niagara.

For example:
• Thorold: 18,000 people: $1.8 M stimulus
• Lincoln: 21,000 people: $1.7 M
• Grimsby: 24,000 people: $5.4 M
• Pelham: 17,000 people: $8.4 M

How did we achieve that together?
First, we met frequently with Pelham's Federal and Provincial representatives and even before the stimulus investments. For example, Mr. Hudak assisted us and connected us with Ministry staff. We also received copies of the successful applications from other Towns and Cities so that we could imitate them.

Staff & Council met with Provincial Ministers (Smitherman & Bradley):
o When Minister Bradley met with staff and I in my office in December 2008, tt was the first time in Pelham's history that a Provincial Minister had ever visited Town Hall!
Staff and I met with Provincial Ministry staff
o Infrastructure, Energy, Hyrdo One; Agriculture
Council also obviously got engaged in process and we used their contacts
Council and I encouraged Town Staff to:
o Use a team approach for Pelham's applications.
I invited the Pelham Business Association, the Chamber of Commerce, and all businesses and residents to get involved and write letters of support for improvements.

The focus on working together may have looked easy to some, but it has resulted in what Minister Jim Bradley stated at groundbreaking for Pelham Fire Station #2 on Friday.
He said "this is yet another milestone in the transformation of Pelham."


DISAPPOINTMENT:
Because we have achieved so much this term, I am disappointed that we couldn’t move ahead faster on issues with Town Property;

But as you know, THIS Council’s hands were tied by the previous Council when they gave control of the process to the Developers.

Good news is that we have managed to pay down $1.1 million of principal – while the previous Council only paid interest (no principal!);
Also the East Fonthill Secondary Plan should be complete in 2011.

CONCLUSION:
Working together we have achieved great things.
We have turned years of wait into months of action.

Pelham's Main Economic "Engine"

Below are my notes for the second prepared question at the Mayoral debate, hosted by the Fonthill Rotary Club on Wednesday, October 6, 2010 at the Royal Canadian Legion.


Question 2)
What do you consider will be the main economic engine in the Town of Pelham for the next 5/10/20 years and beyond? And, what is the Mayor’s responsibility in this regard?


BACKGROUND:
Historically, Pelham’s main economic engines have been agriculture and trade, residential developments and affiliated services.

Recently, also developing other services and a retail sector.
But, have little to no manufacturing or industrial operations.

Really rely on the businesses in other parts of Niagara.
Rely on improvements and advancements at Brock University and Niagara College and other key employers.

Statistics Canada says that 76% of employment work force works outside of Pelham
Double rest of Region – where it’s 36%.

At same time, Town’s First Strategic Plan of 1994, suggested that Town ease up rules on home-based businesses.

Result: 10% of Pelham’s employment work force works from Home, average across Region is 6%. This highlights Pelham's innovative, entrepreneurial residents.


THIS COUNCIL’s Actions:

Decisions and investments so will revitalize Downtowns – draw people and businesses to the downtowns.

Some proposals in the Draft Official Plan and in East Fonthill Secondary Plans should provide additional areas for small and medium sized businesses to grow in the Town.
EG:
Downtown Transitional Zones – near Downtowns
Highway Commercial – along Regional Road #20
Not talking big box stores, here;
Look at businesses that have set-up shop out-of-Town because no location for them:
Royal LePage; JTG Computer Systems; Nauta Home Designs; Personal Touch Home Improvements; Select Coffee Roasters;


Main Economic Driver in Pelham over next 20 years:

Residential Sector and allied services:
From garden centres to flooring stores, from Mobility Niagara to financial services;

Also:
With Pelham’s lively and walkable Downtowns, great culture, and relaxed rules to establish home-based businesses, Pelham needs to become a leader in Niagara in the new economy … the idea / creative economy

The "Creative Economy" includes:
o Graphic designers;
o Engineers;
o Writers and artists;
o Planners;
o Aeronautics – like Accipiter Radar Technologies;
o Bio-tech R&D;
o Robotics;
o Environmental industries;

MAYOR’S ROLE:
Will continue and expand on things already started:
1. Continue to work with Niagara Economic Development Corporation to promote Pelham to outside businesses:
a. Did that through new Economic Development website Pelham which was launched this summer

2. Expand current efforts with the Mayor’s Corporate Visitation Program:
a. current partnership with Chamber of Commerce:
b. Meet with local businesses, to discern what the Town can do or the Chamber can do so they can grow business;

3. Finally, I will also lead development of an overall vision and strategy for Pelham:
i. Not strategic plan for Town Hall;
ii. But, a strategic plan for the entire Town (and similar to the Mayor’s prosperity councils in other communities)

CONCLUSION:
It’s clear that during the next 20 years, Pelham’s economy will continue to be dependent on successes of businesses across the Niagara Region;
Also clear that to survive, Pelham will need to focus on:
• the agricultural sector;
• services to the residential sector, and;
• encouraging more small, creative-economy, idea-based, home-based businesses to start-up and expand.

Recreation & Town-Owned Lands

Below are my notes for the first prepared question at the Mayoral debate, hosted by the Fonthill Rotary Club on Wednesday, October 6, 2010 at the Royal Canadian Legion.


Question 1)
What is your position with regard to the Town providing a Community Recreation Centre and, what is the current status of the Town owned lands at the corner of Hwy. 20 and Rice Road? Please comment citing specific budget considerations and time lines.


Who among us wouldn’t want the best for our community?

Who wouldn’t want a new Twin-Pad arena, a new Community Centre, a new indoor pool, and new outdoor fields?

But the question isn’t simply about being “for or against” a community centre.

The responsible questions are about what Pelham needs and about what we can afford.

It’s responsible to ask what recreational and cultural facilities do we need now; and, what will we need in the future.

It’s also responsible to ask “what can we afford?” What can we afford for land and construction costs now, and for operating costs into the future?

To responsibly answer these questions, Council established a process so we could make informed decisions.

THIS COUNCIL'S ACTIONS:
First, this Council initiated a Facilities Feasibility Study, which studied all major Town facilities, and reported in 2008.
Then, Council established a working committee for recreational facilities with a mandate to:
o Determine the Town short and long term recreational needs;
o Refine Capital & Operating Costs;
o Test the business case for a community centre facility;

The Recreational Facilities Committee Final Report was to have been available by spring 2010, but now won’t be complete until November or December.

NEXT STEPS:
I believe the next step must be to facilitate significant and broad community consultation based on this final report.

With the data in the report, we can have an informed and open, community discussion so we can achieve a common vision about the future recreational and cultural needs for our Town.

Then, Council will be in a good position to make informed decisions in 2011.


RE: Town-Owned Property:
FACTS:
• Previous Council purchased the property in question for$3.6 million or average of $112,000 per acre in March 2005.
• And they ONLY paid interest.
• Paid for property as if parts were zoned commercial and as if had water and sewers -- but that was NOT the case.

Previous Council set to fix the zoning in April 2006, then stopped,
o gave control of planning process to development group in fall 2006.

THIS COUNCIL:
• Started paying down principal -- we have paid down $1.1 M (have $2.5 M remaining)
• Established process to work with Developers to finish planning -- first draft plan is currently with Town for comment;
• This East Fonthill Secondary Plan Process should be complete in 2011.

Only once Secondary Plan process complete will the property be "unlocked" and can any development on the Town-Owned property be allowed to proceed.

Wednesday, September 29, 2010

Haist Street Reconstruction Update


Whether you live on it or near it, you might be wondering about the Town’s progress on reconstructing Haist Street.

You will recall that Haist Street is being reconstructed from Canboro to Welland Road all in one year thanks to infrastructure stimulus funds from the Federal and Provincial governments. The Town had initially budgeted to undertake the work in stages over three years; instead we are able to invest 1/3 of the $5.7 million cost one-year only.

Since I had a couple of questions recently about the project’s financing, I want you to know that the Town is not incurring any debt for the project. Also, the project is well within budget and all contingencies are intact.

The contractor – Provincial Construction from Niagara Falls – has divided the project into two sections.

North of Pancake Lane (to Canboro Road), the contractor has already replaced the storm sewers and the watermain. Until mid-November, the contractor plans to attach water services and install new curbs and sidewalks. Staff expect that the base layer of asphalt will be paved in mid- to late-November.

Work in the section South of Pancake Lane (to Welland Road) is more complicated because the groundwater is so close to the surface. Provincial Construction has had to carry on extensive “dewatering” – pumping of groundwater out of the area – so that they can work underground. Staff expects the installation of storm sewers to be completed by mid-October, and the installation of the new watermain by the end of October. In this Southern half, curb and sidewalk work should take until the end of November and that base coat of asphalt should be paved in mid-December.

In the spring of 2011, Provincial Construction will pave the top-coat of asphalt, add sod and plant trees throughout both sections.

Staff meets with the contractor weekly to ensure the project continues to move along. And, while contingency plans are in place, this timeline is dependent on weather.

Finally, we are trying to be as proactive as possible on communication. For example, the Town's website contains biweekly updates. You can view the most recent update – Number 8 from September 21 – by scrolling down on the homepage of the Town’s website at www.pelham.ca. Staff also sent a letter to AK Wigg families on the first day of school about getting to and from school.

While the end is in sight, I sincerely appreciate the ongoing patience of residents living on and near Haist Street.

Tuesday, September 21, 2010

Pelham's "Glorious" Tree


When was the last time that you stood under the Comfort Maple?

A couple of weeks ago, I made a point of driving down the narrow lane off Melter Road in North Pelham to witness and give thanks for the great tree again.

As you may know, the Comfort Maple is thought to be more than 500 years old and is acknowledged as the oldest sugar maple in Canada! It could well have been a sapling when Christopher Columbus “sailed the ocean blue in 1492.”

The tree is named in honour of the Comfort family, who acquired the land on which the tree grows in 1816. Through the years they cared for the mighty tree and in 1946 reserved a plot of land from their farm for it. Then in 1961, Edna Eleanor Comfort donated the land and tree to the Niagara Peninsula Conservation Authority in honour of her late brother Earl Hampton Comfort. The Comfort Maple Tree has also been officially designated under the Ontario Heritage Act.

The Comfort Maple stands 24.5 metres (80 feet) tall with a crown that is 38 metres (125 feet) in circumference. The Maple measures 6 metres (20 feet) in circumference at the base. Because of its age and at least one major lightening strike, the tree has been repaired over the years with bricks as well as concrete and guy wires.

With such a distinctive feature in our Town, it’s no surprise that it figures prominently in Pelham’s official symbols. For example, our Town Crest contains the image of the Comfort Maple in full, red bloom of the fall. The tree is also one of the key images on the Town’s new website. And, on our recently launched Economic Development website, the Comfort Maple is the logo for Pelham under the “Niagara Original” marketing campaign.



When I visited it, there was a family – a grandfather, his daughter, and her children – also visiting. (The daughter had moved back to the area and the grandfather wanted to reacquaint them with some local features.) While the wind blew through the leaves and a thunderstorm developed, we each observed how we felt happy, content, and safe under the branches of the huge tree.

For me, the Comfort Maple is inspiring, symbolizes strength and tradition, and calls on us to give thanks; as the interpretive sign reads, “O Lord, how glorious are thy works.”

Wednesday, September 15, 2010

Ridgeville Potable Water Station Update


If you have driven by the corner of Canboro Road and Effingham lately, you will have seen some changes to the former private water filling station. I want to give you an update on the work being done.

On June 30, the company that had been operating a private water filling station for more than a decade closed its business. That company had rented the location.

Immediately after the closure, the Town received many calls from rural residents who wanted to know from whom they could purchase safe drinking water to fill their cisterns. In addition, two water haulers contacted the Town about how they could provide safe water to Pelham’s rural residents.

Because of the Province’s stipulations for higher water quality standards, most other Niagara municipalities – including Lincoln, Grimsby, Fort Erie, Port Colborne, Welland, Niagara Falls, Niagara-on-the-Lake, and St. Catharines – already operate their water filling stations.

Staff approached Council at our July 19, 2010 meeting and suggested that the Town enter into a letter of intent with the property-owner to provide a water filling station at that location. Council unanimously agreed and gave authority to develop a lease agreement and begin site preparation.

The Town organized a public open house August 20 to better inform immediate residents and business owners of the proposed changes. Participants were encouraged to fill in comment sheets with questions or comments.

Then, based on the feedback from the community and the plans, Council agreed to proceed on August 23 with a temporary lease agreement (three years) with the property owner. Council was clear that a water-filling station at that location it is not the long-term vision for Ridgeville; accordingly, the Town will use the time to find a more permanent location.

So what is planned?

First, only bonded water haulers that enter into an agreement with the Town can use the station. This will allow us to stipulate the hours of operation – from 7:00 AM to 9:00 PM weekdays and 9:00 AM to 6:00 PM on weekends – and ensure that the Town is paid in full for water usage. We can also stipulate the traffic route, that vehicles do not idle while filling, and the type of trucks are used so the roads don’t get torn up. (These items cannot be regulated with private operations.)

Second, since the number of Pelham residents who require delivered water has not changed, we don’t anticipate an increase in truck traffic.

Third, the existing site will be paved, additional parking spots for Ridgeville shoppers will be added, and the water spout will be of the latest, safest technology.

Monday, August 23, 2010

Meeting with Ministers at AMO Conference

Last week, Councillors Emmons and Durley, Town CAO Martin Yamich, and I attended the Association of Municipalities of Ontario Conference (AMO). The Annual Conference offers a range of learning sessions and networking opportunities for municipalities. More than 1400 delegates attended the three-day event in Windsor themed “Propelling Economic Prosperity.”

While at AMO, your Pelham reps also directly advanced your interests with the Provincial Government through meetings with four Ministers.

First, we met with the Honourable Jim Bradley, Minister of Municipal Affairs & Housing, to seek clarity about some Greenbelt issues. You see, while re-zoning the new Fire Station #2 property, we had hoped to include some overflow parking in the back portion of the 4.9 acre site. But, under a strict interpretation of the Greenbelt, that was not allowed. Rest assured, the Town did accommodate all the parking in the 2.3 acre “urban boundary” portion of the site. However, we are worried about a strict interpretation for the Centennial Park Master Plan, which calls for building a concession / washroom facility in the Greenbelt. Also, should the Town need to make changes at Fire Station #3 in the Shorthills, any other suitable properties would be Greenbelted. Provincial staff promised to work with Town staff to clarify these issues.

Next, we met with the Hon. Madeline Meilleur, Minister of Community & Social Services regarding the Province’s accessibility standards. You see, nearly six months after we approved our 2010 Capital Budget, the Province changed accessibility requirements for this fall’s Municipal Elections. While it’s good that voting stations now need to be fully accessible, we asked that the Minister consider Municipal budget schedules next time. We also suggested that any future Provincial grants include specific criteria for increasing accessibility. Finally, we informed the Minister about our nine new, fully accessible playgrounds; she was very impressed and may accept our invitation to tour them.

Then, Regional Chair Peter Partington and I met with Hon. Peter Fonseca, Minister of Labour, regarding public sector arbitration awards. We pointed out that while the Provincial Government called on Provincial ministries and municipalities to show fiscal restraint, recent arbitrations have disregarded tax-payer affordability. We referenced two recent three-year awards: 12% for Orangeville Police, and 10% for Niagara Regional Police. The Minister promised to continue to work with the Region on this issue.

Finally, Chair Partington joined Pelham’s representatives in a meeting with Mr. David Orazietti, MPP & Parliamentary Assistant for the Minister of Natural Resources. We asked again that the Ministry not reduce the Area of Natural & Scientific Interest (ANSI) on the Fonthill-Kame. We understand that the Ministry expects to complete its work this fall.

Wednesday, August 11, 2010

Playgrounds Better Than Freezies!

So, do you think our nine new, fully-accessible playgrounds are better than freezies?

Let me explain.

You see, we enjoyed a special visit from Dean Allison, MP Niagara-West Glanbrook, and Minister Jim Bradley, MPP St. Catharines, on July 30. Mr. Allison and Minister Bradley joined me, members of Town Council, and others to celebrate the extraordinary Federal and Provincial investments in Pelham.

All the infrastructure projects total $12.6 million, plus $1 million to bury utilities in Downtown Fonthill. The projects include Pelham Street Reconstruction ($2.5 million + $1 million to bury utilities); Haist Street Reconstruction ($5.7 million); Replacing Fire Station #2 ($2.9 million); Playground Replacements ($1.1 million); Town Hall expansion ($380,000).

These investments are nearly triple the Town’s normal annual capital budget. And, while other Cities and Towns have received millions of dollars through the decades, Pelham was always “shut-out;”until now, that is! Pelham now leads since these investments represent the second highest per capital funding in Niagara!

How did we achieve this?

Council, Staff and the Community worked together to ensure we were prepared for the stimulus funding. Staff and I worked with MPs and MPPs. Staff worked with Ministry staff to review and emulate other successful projects and used a team approach to develop our applications. I invited you and others to get involved and write letters of support. (Thanks to the many that did!). Working together, we achieved investments now that will change years of wait into months of action.

But, what about the Town-wide playground renewal? The nine playgrounds include Harold Black, Centennial, Cherry Ridge, Hurleston, North Pelham, Marlene Stewart Streit, Pelham Corners, and Rolling Meadows. Coloured brightly and fitted with artificial turf to prevent injury and allow wheelchair, walker, stroller access, we tailored each playground to its area. For example, Marlene Stewart Streit’s brown and green match the trees and leaves surrounding “the pit.” Centennial Park’s yellow and purple match the colours of the Fenwick Lions Club (who donated the park to the Town in 1967).

Pelham now stands at the only Niagara community (perhaps the only in Ontario) with fully accessible playgrounds! The equipment includes climbers, platforms, swings, and slides for kids and exercise equipment for parents.

So, what do some kids think about their new playground? At the ribbon cutting on July 30, we offered freezies to neighbourhood children. Despite the warm afternoon, they didn’t want any. Why? Because they didn’t want to stop playing on the equipment! I hope all the new equipment will enrich the lives of Pelham residents for many years to come.

Wednesday, July 28, 2010

Council Listened, Then Approved New Noise By-Law

After the input by hundreds of residents, the hours of discussion at meetings, and the months of work by staff, it was a little odd that you could hear barely a sound when Council adopted the new Noise Bylaw at our regular meeting on July 19.

As you know, the Municipal Act allows Towns to pass bylaws to prohibit and regulate noise to preserve, protect, and promote public health, safety, welfare, and peace and quiet.

The previous Noise Bylaw was enacted in September 1981 with a very minor revision (to change the penalty clause) in February 1993. While it comprehensively covered all manner of noises, it also contained a major drawback.

The old Bylaw used a map to delineate between the rules in residential and agricultural areas. As you can imagine, the Town has grown considerably in the last 30 years and the map was out-of-date. The map didn’t include residential growth areas like Timber Creek, Timsdale, Chestnut Ridge, or Martha Court.

In contrast, the new Bylaw is more a living document because it relies on the Zoning Bylaw. If a property’s zoning changes, the rules for that property change.

Council sought feedback from the community. We received more than 50 letters, a couple of petitions, and a dozen presentations at a public meeting. Two major concerns were brought forward: 1) the proposed 9 PM restriction on “yelling, shouting, hooting, whistling, and singing”, and 2) the proposed restriction on using a snow blowers or plows before 7AM.

Rest assured, Council fixed the Bylaw in both of these instances. First, staff admitted that the 9 PM restriction was an error and Council moved it back to 11 PM to match other restrictions (like loud music). Council also agreed with the vast majority of residents and removed any restrictions on the time of day to remove snow.

The new Bylaw also removes some antiquated provisions. For example, the regulation of “snow making equipment” was removed since Lookout Golf Club hasn’t had a ski run for many years.

In addition, since society is more environmentally conscious now, the new Bylaw allows a maximum of 30 minutes for commercial vehicle idling in non-residential areas; it would ban such idling in residential areas.

On behalf of Council, I thank everyone that participated in the process and provided advice and feedback. Working together we developed a far superior Bylaw that should serve the Town well for many years to come.

Wednesday, July 21, 2010

Frustrated with Property Progress

At a special meeting on June 15, Council debated the future of the Town-owned property at the corner of Rice Road and Regional Road #20. Council voted to “not dispose of any portion of the Town-owned lands in East Fonthill” until the resolution of three significant issues.

First, the lands must be converted from “Business Park” to other designations as part of the Official Plan review. You see, in 1997 the Town designated 59 acres at Rice and Regional Road #20 as “Business Park.” When the previous Council purchased 32 acres of this property in 2005, they paid for it as if 7.9 acres were designated “Commercial” and with the intention of using most of the remaining for recreational uses. Unfortunately, neither use is (or was) allowable in Business Parks.

And, while the previous Council started to fix the designation, they stopped in April 2006 at the demand of a majority Landowners Group. Then, as had been forewarned, the Province locked-in any such “Employment Lands” (including Business Parks) in June 2006; the only way to unlock that designation is through a “comprehensive review.” The current Council began that work in 2008 and is on track to (hopefully) change it in the new Official Plan in September / October 2010.

Second, the Landowners Group must finalize the East Fonthill Secondary Plan. You see, the previous Council gave away control of the detailed planning process – called a “Secondary Plan” – to that majority Landowners Group in September 2006. Despite this Council working as closely as possible with the Group and despite their 2008 and 2009 promises of imminent completion, the Group didn’t file a first draft until this June. Now, the rest of the process should take until at least the spring of 2011.

Third, the decision on the property’s use should not be decided until Council considers the recommendations of the Recreational Facilities Committee. While anticipated this past May / June, the Committee is now not expected to review the business case and final draft report until September; the earliest Council could consider it would then be October 2010.

As I stated during the meeting, I am extremely frustrated with this entire process. I believe that these planning issues should have been taken care of before the property was purchased; for example, the current Council rezoned property before we completed its purchase for the new Fire Station #2. I also never imagined it would take so long to test the business case and answer all the community’s questions about the need and costs for new recreational facilities.

Please be assured that I will continue to keep you informed on these matters.